We complete every project within the agreed term because of a winning combination of enough materials and skilled workers.
.
Many overhead travelling cranes compel us to deliver a compact electrical installation. Because of the long distances involved it was necessary, in this case, to calculate the cable dimensions correctly in order to ensure a good distribution of power and tension.
231 luminaires, each fitted with a 400W mercury vapour lamp, ensure that the shop floor (surface area =14,700m²) is perfectly lit.
In the existing production unit too, the lighting was completely renewed. Thanks to ‘clear as tap water’ agreements the Client was able to continue working, without interruption, while De Keyser electrical engineering did the adaptation.